Prison Hill Siphon Cleaning
Cleaning a 3,050-foot underground siphon during a strict two-week canal outage.
The project
FEDVET Construction selected Alvarez & Shaw to clean the full interior of the Bureau of Reclamation’s Prison Hill Siphon — a 10-foot-diameter pipe about 3,050 feet long — and haul away an estimated 1,335 tons of nonhazardous material.
A standard skip-loader bucket has a flat bottom; the siphon is round. Chase Alvarez designed and fabricated a custom rounded bucket that fit the curved liner, so crews could scrape debris a standard bucket couldn’t reach.
Underground, phones didn’t work. We installed a Wi-Fi mesh system with pods along the pipe so crews could coordinate equipment and share safety information deep inside the structure.
All on-site cleaning had to fit a two-week outage of the M.O.D.E. Canal. The work also included an earthen plug at the inlet, confined-space safety and PPE, documented disposal, and Davis-Bacon certified payroll.
Help meet your participation goals.
- 8(a)
- DBE
- MBE
- SBE
- SLBE
- SB-PW
- SB-Micro
Have a project out to bid?
Public agencies, general contractors and developers: send plans, specs and bid dates and we’ll get you a competitive number for concrete, paving and site work.