Edward J. Schwartz Federal Building
Concrete work for a modernization of U.S. Probation offices, a childcare center and site security — in a fully occupied federal building.
The project
The Edward J. Schwartz Federal Building improvement project modernized the U.S. Probation offices, the childcare center and the site-security infrastructure at 880 Front Street in downtown San Diego.
Because the building had to remain fully operational, noisy or disruptive work was generally limited to outside weekday hours of 7:00 a.m. to 6:00 p.m., and utility shutdowns required coordination with GSA and at least 24 hours’ notice. The childcare space was phased to finish about a month ahead of the probation offices.
The concrete paving — curbs, gutters and pedestrian walks — had to meet a detailed specification: submitted mix designs, Grade 60 rebar and flat-sheet welded-wire reinforcement, a compacted sand subgrade proof-rolled before placement, saw-cut joints to one-quarter of slab depth, seven days of moist curing and strength testing at 7 and 28 days.
Help meet your participation goals.
- 8(a)
- DBE
- MBE
- SBE
- SLBE
- SB-PW
- SB-Micro
Have a project out to bid?
Public agencies, general contractors and developers: send plans, specs and bid dates and we’ll get you a competitive number for concrete, paving and site work.